Please use this identifier to cite or link to this item: https://repository.iimb.ac.in/handle/123456789/581
Title: Optimal deployment of parallel teams in new product development
Authors: Saranga, Haritha 
Keywords: New product development;Parallel teams;Multi armed bandit;Gittins index;Sequential development;Overlapped development
Issue Date: 2008
Publisher: Indian Institute of Management Bangalore
Series/Report no.: IIMB Working Paper-271
Abstract: Speed in product development can be defined as the thin line that determines success or failure in many fast growing industries today. Strategies like set based concurrent engineering and parallel team deployment have been used to accelerate new product introduction by successful companies like Toyota. In the current paper, these two strategies are combined to investigate the impact of generating sets of alternatives using parallel teams on the revenue generated from new product development. The trade-off between cost and speed of development due to deployment of parallel teams in product development using the Multi Armed Bandit framework are also explored. For sequential and overlapped development strategies, quantitative models to qetermine the optimum number of product development teams at different stages of development have been constructed using the Gittins Index strategy. These models have been tested empirically using hypothetical data and the results show that the higher flexibility induced quality due to larger set of design alternatives results in higher rewards, despite the higher cost of deploying multiple teams.
URI: http://repository.iimb.ac.in/handle/123456789/581
Appears in Collections:2008

Files in This Item:
File Description SizeFormat 
WP.IIMB.271.pdf1.11 MBAdobe PDFView/Open
Show full item record

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.