Please use this identifier to cite or link to this item: https://repository.iimb.ac.in/handle/2074/10097
Title: A comparison of network, assembly-line and jon shop based heuristics in project scheduling under uncertainty: an experimental investigation
Authors: Gopalan, M R 
Keywords: Project scheduling;Heuristic evaluation
Issue Date: 1987
URI: http://repository.iimb.ac.in/handle/2074/10097
Appears in Collections:1980-1989

Files in This Item:
File SizeFormat 
Gopalan_IIMBMR_1987_Vol.2_Iss.2.pdf5.74 MBAdobe PDFView/Open    Request a copy
Show full item record

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.