Please use this identifier to cite or link to this item:
https://repository.iimb.ac.in/handle/2074/10387
Title: | Estimation of number of AGVs for an FMS: An analytical model | Authors: | Mahadevan, B Narendran, T T |
Keywords: | Industrial robots;Materials handling;Mathematical models;Parameter estimation;Automatic guided vehicles (AGVs);Flexible manufacturing systems | Issue Date: | 1993 | Abstract: | The estimation of the number of vehicles is of paramount importance in AGV-based systems and requires a careful and detailed study, especially when AGVs are selected as the primary material handling system. This paper describes the development of an analytical model for estimation of the number of AGVs. The ability of the model to estimate the vehicle requirements under various conditions have been tested. The results indicate the consistent performance of the model and confirm the utility. © 1993 Taylor & Francis Group, LLC. | URI: | http://repository.iimb.ac.in/handle/2074/10387 | DOI: | 10.1080/00207549308956815 |
Appears in Collections: | 1990-1999 |
Files in This Item:
File | Size | Format | |
---|---|---|---|
Mahadevan_IJPR_1993_Vol.31_Iss.7.pdf | 476.29 kB | Adobe PDF | View/Open Request a copy |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.