Please use this identifier to cite or link to this item: https://repository.iimb.ac.in/handle/2074/16142
Title: Lead time reduction of capital equipment procurement and design of a monitoring system; Hindustan Machine Tools Limited, Srinagar
Authors: Krishna, Ajit 
Keywords: Machine tools;Printing industry;Printing machinery manufacture;Monitoring system
Issue Date: 1985
Publisher: Indian Institute of Management Bangalore
Series/Report no.: PGP_SP_M5_027
URI: https://repository.iimb.ac.in/handle/2074/16142
Appears in Collections:1980-1989

Files in This Item:
File SizeFormat 
PGP_SP_M5_027.pdf19.65 MBAdobe PDFView/Open    Request a copy
Show full item record

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.