Please use this identifier to cite or link to this item:
https://repository.iimb.ac.in/handle/2074/16142
Title: | Lead time reduction of capital equipment procurement and design of a monitoring system; Hindustan Machine Tools Limited, Srinagar | Authors: | Krishna, Ajit | Keywords: | Machine tools;Printing industry;Printing machinery manufacture;Monitoring system | Issue Date: | 1985 | Publisher: | Indian Institute of Management Bangalore | Series/Report no.: | PGP_SP_M5_027 | URI: | https://repository.iimb.ac.in/handle/2074/16142 |
Appears in Collections: | 1980-1989 |
Files in This Item:
File | Size | Format | |
---|---|---|---|
PGP_SP_M5_027.pdf | 19.65 MB | Adobe PDF | View/Open Request a copy |
Google ScholarTM
Check
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.