Please use this identifier to cite or link to this item: https://repository.iimb.ac.in/handle/2074/16229
Title: Techno economic feasibility study of installing a flexible manufacturing system in fabrication; Bharat Heavy Electricals Limited, Bangalore
Authors: Shastry, A K 
Keywords: Management information system;MIS;Production management;Manufacturing systems;Material handling system
Issue Date: 1986
Publisher: Indian Institute of Management Bangalore
Series/Report no.: PGP_SP_M6_042
URI: https://repository.iimb.ac.in/handle/2074/16229
Appears in Collections:1980-1989

Files in This Item:
File SizeFormat 
PGP_SP_M6_042.pdf2.41 MBAdobe PDFView/Open    Request a copy
Show full item record

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.