Please use this identifier to cite or link to this item: https://repository.iimb.ac.in/handle/2074/16550
Title: Inventory system and lead time analysis; Bharat Heavy Electricals Limited, Bangalore
Authors: Sukesh, S 
Keywords: Inventory system;Lead time analysis
Issue Date: 1989
Publisher: Indian Institute of Management Bangalore
Series/Report no.: PGP_SP_M9_078
URI: https://repository.iimb.ac.in/handle/2074/16550
Appears in Collections:1980-1989

Files in This Item:
File SizeFormat 
PGP_SP_M9_078.pdf4 MBAdobe PDFView/Open    Request a copy
Show full item record

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.