Please use this identifier to cite or link to this item: https://repository.iimb.ac.in/handle/2074/16552
Title: Problems of contractors, analyse/diagnose and recommend suitable measures with the objective of improving effectiveness; National Thermal Power Corporation Limited, Allahabad
Authors: Thakur, Animesh 
Keywords: Contractors;Power sector;Thermal power
Issue Date: 1989
Publisher: Indian Institute of Management Bangalore
Series/Report no.: PGP_SP_M9_080
URI: https://repository.iimb.ac.in/handle/2074/16552
Appears in Collections:1980-1989

Files in This Item:
File SizeFormat 
PGP_SP_M9_080.pdf2.21 MBAdobe PDFView/Open    Request a copy
Show full item record

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.