Please use this identifier to cite or link to this item: https://repository.iimb.ac.in/handle/2074/16802
DC FieldValueLanguage
dc.contributor.authorSen, Trinath
dc.date.accessioned2021-01-30T10:54:55Z-
dc.date.available2021-01-30T10:54:55Z-
dc.date.issued2010
dc.identifier.urihttps://repository.iimb.ac.in/handle/2074/16802-
dc.description.abstractThe summer internship project was for the scope of renewable energy in green consulting and Leadership in Energy & Environmental Design (LEED) certifications. The.objective of my project was threefold: 1. Understanding the scope and financial feasibility through fiscal incentives for the Solar power in India 2. Understanding the scope and financial feasibility through fiscal incentives for the Wind power in India 2. Understanding the emerging technical sides in controllers like Maximum Power Point Tracker (MPPT) The project was done primarily through secondary research though some market research was done as and when required.
dc.publisherIndian Institute of Management Bangalore
dc.relation.ispartofseriesPGP_SP_P10_151
dc.subjectPower sector
dc.subjectSolar power
dc.subjectWind power
dc.titleReport on feasibility assessment of solar and wind power generation with proposed incentive schemes and regulations; Milestone Ecofirst Advisory Services
dc.typeSummer Project Report-PGP
dc.pages11p.
dc.identifier.accessionE35071
Appears in Collections:2010
Files in This Item:
File SizeFormat 
PGP_SP_P10_151.pdf824.8 kBAdobe PDFView/Open    Request a copy
Show simple item record

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.