Please use this identifier to cite or link to this item: https://repository.iimb.ac.in/handle/2074/17199
DC FieldValueLanguage
dc.contributor.authorRavi Shankar, S
dc.date.accessioned2021-02-25T13:24:35Z-
dc.date.available2021-02-25T13:24:35Z-
dc.date.issued1994
dc.identifier.urihttps://repository.iimb.ac.in/handle/2074/17199-
dc.description.abstractThis report is an analysis of the Project Management System of one of the divisions of Thermax limited addressing the problems of cost and time overruns in particular. Four turnkey Projects were analysed in detail and common areas of concern were enlisted. As an ongoing effort, few organisations involving in similar operations were studied for their Project Management and this study was utilised in making some useful suggestions to improve the Project Management of this division per se. The main recommendation is that the organisation should concentrate more on controlling time overruns and on completion. of the project undertaken within the committed time. It was also suggested to incorporate an organisation structure that is most suited to execution of turnkey projects-A Temporary Matrix structure.
dc.publisherIndian Institute of Management Bangalore
dc.relation.ispartofseriesPGP_SP_N4_155
dc.subjectProject management system
dc.subjectCost and overruns
dc.titleProject management system: An analysis of cost and time overruns; Thermax Limited
dc.typeSummer Project Report-PGP
dc.pages30p.
dc.identifier.accessionE7081
dc.identifier.accessionE7082
Appears in Collections:1990-1995
Files in This Item:
File SizeFormat 
PGP_SP_N4_155.pdf440.17 kBAdobe PDFView/Open    Request a copy
Show simple item record

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.