Please use this identifier to cite or link to this item: https://repository.iimb.ac.in/handle/2074/18192
Title: Challenges in setting up global scale supplier capacities in India for (mobile phone) batteries [Nokia]
Authors: Hemchandar, R 
Gaur, Yogesh 
Keywords: Batteries;Mobile phone batteries;Storage battery;Mobilephone industries
Issue Date: 2011
Publisher: Indian Institute of Management Bangalore
Series/Report no.: PGP_CCS_P11_042
Abstract: Hence, as discussed above, Nokia can choose either of the five options or a combination of the options to go ahead with. Nokia has to evaluate the options in depth keeping in mind the long term and short term perspective. In order to carry out the recommendations, Nokia initially has to formulate and take initiatives with different stakeholders [government, Rubamin, suppliers] and integrate them. An Integrated communication strategy has to be established. Nokia has to address the clear benefits to each of the players through Licensing, Joint venture, strategic alliance, strike an exclusivity deal [manufacturing and selling only to Nokia] if possible, and incentivize them [sharing costs, facilitating the supply of raw materials], and basically to help make a conducive environment for the battery manufacturers [Samsung] to set up a plant in India.
URI: https://repository.iimb.ac.in/handle/2074/18192
Appears in Collections:2011

Files in This Item:
File SizeFormat 
PGP_CCS_P11_042_E36492_POM.pdf1.08 MBAdobe PDFView/Open    Request a copy
Show full item record

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.