Please use this identifier to cite or link to this item: https://repository.iimb.ac.in/handle/2074/20826
DC FieldValueLanguage
dc.contributor.authorLimon, Yasemin
dc.contributor.authorKrishnamurthy, Ananth
dc.date.accessioned2022-03-13T16:22:18Z-
dc.date.available2022-03-13T16:22:18Z-
dc.date.issued2020
dc.identifier.issn0360-8352
dc.identifier.urihttps://repository.iimb.ac.in/handle/2074/20826-
dc.description.abstractWe consider the scheduling problem for biomanufacturing projects that involve multiple tasks and “no-wait” constraints between some of these tasks. The aim is to create schedules that ensure timely delivery of products while enabling schedule revisions to accommodate additional constraints realized during the execution of these projects. We formulate the problem as a mixed-integer linear programming model with the objective of minimizing total tardiness, and propose a dynamic scheduling approach that solves a series of modified mixed-integer linear programming models to revise and improve the schedule. We conduct numerical studies to investigate the performance of this approach and compare its performance to a traditional proactive scheduling approach. In collaboration with biomanufacturing companies, we create a scheduling tool and validate the approach with implementation in an industry setting.
dc.publisherElsevier B.V.
dc.subjectDynamic scheduling
dc.subjectBiomanufacturing
dc.subjectProtein manufacturing
dc.subjectNo-wait
dc.subjectMixed-integer linear program
dc.titleDynamic resource scheduling of biomanufacturing projects
dc.typeJournal Article
dc.identifier.doi10.1016/j.cie.2020.106527
dc.pages1-11p.
dc.vol.noVol.147
dc.journal.nameComputers and Industrial Engineering
Appears in Collections:2020-2029 C
Show simple item record

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.