Please use this identifier to cite or link to this item:
https://repository.iimb.ac.in/handle/2074/21904
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | Hazra, Jishnu | |
dc.contributor.author | Kumar, Shivam | |
dc.contributor.author | Murdia, Supriya | |
dc.date.accessioned | 2023-05-17T14:57:19Z | - |
dc.date.available | 2023-05-17T14:57:19Z | - |
dc.date.issued | 2022 | |
dc.identifier.uri | https://repository.iimb.ac.in/handle/2074/21904 | - |
dc.description.abstract | To plan a program for arriving at least logistics cost for shipping lubricants to various locations from Blending Plants. The current supply cha in of the Lubes products at HPCL has a lot of inefficiencies leading to a higher logistics cost and lower margin subsequently. While the items get shipped from Manufacturing location to 13 Mega Warehouses and 50 Branch Plants (Depot/COOs), there exists multiple redundant routes leading to several criss-cross movements. This leads to higher kms travelled by trucks and higher warehouse management cost as well. | |
dc.publisher | Indian Institute of Management Bangalore | |
dc.relation.ispartofseries | PGP_CCS_P22_049 | |
dc.subject | Supply chain | |
dc.subject | Lubricants | |
dc.subject | Logistics | |
dc.subject | Logistics cost | |
dc.subject | Blending plants | |
dc.title | Plan a program for arriving at least logistics cost for shipping lubricants to various locations from blending plants | |
dc.type | CCS Project Report-PGP | |
dc.pages | 14p. | |
Appears in Collections: | 2022 |
Files in This Item:
File | Size | Format | |
---|---|---|---|
PGP_CCS_P22_049.pdf | 1.93 MB | Adobe PDF | View/Open Request a copy |
Google ScholarTM
Check
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.