Please use this identifier to cite or link to this item: https://repository.iimb.ac.in/handle/2074/8279
Title: Feasibility study of the proposed east-west railway corridor: Bandra - Mankhurd - Panvel line
Authors: Indian Institute of Management Bangalore 
Keywords: Transporatation;Railways
Issue Date: 1978
Publisher: Indian Institute of Management Bangalore
URI: http://repository.iimb.ac.in/handle/2074/8279
Appears in Collections:1975-1979

Files in This Item:
File SizeFormat 
C29663.pdf4.07 MBAdobe PDFView/Open    Request a copy
Show full item record

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.