Please use this identifier to cite or link to this item: https://repository.iimb.ac.in/handle/2074/9891
DC FieldValueLanguage
dc.contributor.advisorMahadevan, B
dc.contributor.authorGokhale, C Pen_US
dc.contributor.authorMitra, Gautamen_US
dc.date.accessioned2019-08-02T09:36:53Z-
dc.date.available2019-08-02T09:36:53Z-
dc.date.created1997
dc.date.issued1997
dc.identifier.urihttp://repository.iimb.ac.in/handle/2074/9891
dc.description.abstractIn the ambient of increased competition coupled with the recent slow market growth, it has become imperative for us to bring down our costs in order to remain profitable. The present system of manufacturing is based on market demand projections. At times of sluggish market growth, such a system leads to undue accumulation of inventories at various stages which adversely affect the costs & profitability. In view of the above, the project on "Single Piece Flow" has been taken up under the umbrella of other ongoing Business Process Re-engineering projects in the Nashik Works of our company. Nashik Works manufactures state-of-the-art industrial electronics products in a modern and sophisticated set-up. The scope of our project has been defined as evolving a 'Pull System' of manufacturing leading to Single Piece Flow for the PLC product family of Automation Division. Single Piece Flow, in our context, essentially means a "flexible batch-size" which can be varied exactly as per customer demand. This will give us the capability to cater to very small quantity requirements of the customer. For Single Piece Flow, it is essential to establish a smooth flow of production on the shop-floor without interruptions / accumulation at intermediate stages. In the Pull system, the customer triggers the manufacturing process from Product Assembly stage backwards along the chain. By this, it is ensured that the production is done exactly as per customer requirement. As a first step towards evolving the new system, the existing process was studied in detail in order to identify the barriers to smooth flow. Also, the major contributors to manufacturing lead-time were identified. Additionally, the customer demand patterns of selected products were analyzed. These gave us the platform for evolving the new system wherein the existing barriers are removed or minimized.en_US
dc.language.isoenen_US
dc.publisherIndian Institute of Management Bangaloreen_US
dc.relation.ispartofseriesProject Report-Management Programme for Technologist; PR-MPT-N6-28-
dc.titleSingle piece flow-Siemens Ltd.: Calcuttaen_US
dc.typeProject Report-MPT
Appears in Collections:1995-1999
Files in This Item:
File Description SizeFormat 
N6-28.pdf13.4 MBAdobe PDFView/Open    Request a copy
Show simple item record

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.