dc.description.abstractTITAN is today's undisputed leader in the quartz analog watch segment in the country with a market share of 42 %. After having parted ways with Timex, the corporate strategy has now shifted from the high priced to the low and medium priced segments. In the post liberalisation era, relaxation of foreign policies has seen a spurt of players Hoe SfTCO, Maxima, Ajanta, in the low priced segment and foreign brands 8% Citizen in the medum and high priced segments. Free trade not being a distant dream, competition is expected to hot up. THan has roafood that it is high time to re-engineer its manufacturing actiw6es and introduce lean manufacturing techniques, to focus on reducing cost and improving speed and flotibfity. The main objective of this project is to study the existing manufacturing configuration at the Watch Assembly and Case Plant and implement lean production systems. Though the process of change has been taking place for some time now, it has been isolated and without following a logical sequence. Through (his project we have systematicaRy approached the lean production system like shortening set up time, multi-skilling, cellular manufacturing and Kanban system At this juncture it is heartening to indicate that the Kanban system is already implemented in one of the movement assembly lines (for caiibre 5120). Framing cells and single piece flow with a motorised conveyor line is expected to be the next step in the ladder approaching lean manufecturing. Lead time at Watch Assembly and Case Plant are expected to crash by about 50 % consequently leading to a savings of Rs. 145 lakhs. This study also helped us to meet the business plan for the next 2 years.en_US
dc.language.isoenen_US
dc.publisherIndian Institute of Management Banglore.en_US
dc.relation.ispartofseriesProject Report-Management Programme for Technologist; PR-MPT-N8-04-
dc.subjectSystem improvementen_US
dc.subjectManufacturing improvement , watch assemblyen_US
dc.subjectWatch industryen_US
dc.subjectWatch manufacturing and marcating companisen_US
dc.subjectQuality controle standardsen_US
dc.titleEnhancing manufacturingcompitance using lean manufacturing techniques : Titan Industries Ltd ; Hosur-Indian Institute of Management Banglore: Banglore.en_US
dc.typeProject Report-MPT-
Appears in Collections:1995-1999
Files in This Item:
File Description SizeFormat 
N8-04.pdf13.77 MBAdobe PDFView/Open    Request a copy
Show simple item record

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.