Please use this identifier to cite or link to this item:
https://repository.iimb.ac.in/handle/2074/15906
Title: | Reasons for interruptions/delays arising in various departments, affecting the smooth flow of necessary documents to shops, raw materials requirement, subdeliveries required for assembly; Quality control Department, Bharat Heavy Electricals Ltd., Thiruchirapalli | Authors: | Raghunathan, N S | Keywords: | Project management;Material management;Operations design and control | Issue Date: | 1982 | Publisher: | Indian Institute of Management Bangalore | Series/Report no.: | PGP_SP_M2_049 | URI: | https://repository.iimb.ac.in/handle/2074/15906 |
Appears in Collections: | 1980-1989 |
Files in This Item:
File | Size | Format | |
---|---|---|---|
PGP_SP_M2_049.pdf | 4.61 MB | Adobe PDF | View/Open Request a copy |
Google ScholarTM
Check
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.