Please use this identifier to cite or link to this item: https://repository.iimb.ac.in/handle/2074/15906
DC FieldValueLanguage
dc.contributor.authorRaghunathan, N S
dc.date.accessioned2020-11-18T14:01:42Z-
dc.date.available2020-11-18T14:01:42Z-
dc.date.issued1982
dc.identifier.urihttps://repository.iimb.ac.in/handle/2074/15906-
dc.publisherIndian Institute of Management Bangalore
dc.relation.ispartofseriesPGP_SP_M2_049
dc.subjectProject management
dc.subjectMaterial management
dc.subjectOperations design and control
dc.titleReasons for interruptions/delays arising in various departments, affecting the smooth flow of necessary documents to shops, raw materials requirement, subdeliveries required for assembly; Quality control Department, Bharat Heavy Electricals Ltd., Thiruchirapalli
dc.typeSummer Project Report-PGP
dc.pages58p.
dc.identifier.accessionA10443
Appears in Collections:1980-1989
Files in This Item:
File SizeFormat 
PGP_SP_M2_049.pdf4.61 MBAdobe PDFView/Open    Request a copy
Show simple item record

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.