Please use this identifier to cite or link to this item: https://repository.iimb.ac.in/handle/2074/15906
Title: Reasons for interruptions/delays arising in various departments, affecting the smooth flow of necessary documents to shops, raw materials requirement, subdeliveries required for assembly; Quality control Department, Bharat Heavy Electricals Ltd., Thiruchirapalli
Authors: Raghunathan, N S 
Keywords: Project management;Material management;Operations design and control
Issue Date: 1982
Publisher: Indian Institute of Management Bangalore
Series/Report no.: PGP_SP_M2_049
URI: https://repository.iimb.ac.in/handle/2074/15906
Appears in Collections:1980-1989

Files in This Item:
File SizeFormat 
PGP_SP_M2_049.pdf4.61 MBAdobe PDFView/Open    Request a copy
Show full item record

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.