Title: Project management system: An analysis of cost and time overruns; Thermax Limited
Authors: Ravi Shankar, S 
Keywords: Project management system;Cost and overruns
Issue Date: 1994
Publisher: Indian Institute of Management Bangalore
Series/Report no.: PGP_SP_N4_155
Abstract: This report is an analysis of the Project Management System of one of the divisions of Thermax limited addressing the problems of cost and time overruns in particular. Four turnkey Projects were analysed in detail and common areas of concern were enlisted. As an ongoing effort, few organisations involving in similar operations were studied for their Project Management and this study was utilised in making some useful suggestions to improve the Project Management of this division per se. The main recommendation is that the organisation should concentrate more on controlling time overruns and on completion. of the project undertaken within the committed time. It was also suggested to incorporate an organisation structure that is most suited to execution of turnkey projects-A Temporary Matrix structure.
URI: https://repository.iimb.ac.in/handle/2074/17199
Appears in Collections:1990-1995

Files in This Item:
File SizeFormat 
PGP_SP_N4_155.pdf440.17 kBAdobe PDFView/Open    Request a copy
Show full item record

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.