Please use this identifier to cite or link to this item:
https://repository.iimb.ac.in/handle/2074/21876
Title: | Manpower productivity improvement of production line; Emami Limited | Authors: | Paul, Supravo Anjum, Nishat |
Keywords: | Manpower productivity;Manpower deployment | Issue Date: | 2022 | Publisher: | Indian Institute of Management Bangalore | Series/Report no.: | PGP_CCS_P22_020 | Abstract: | From our process analysis, we are able to enhance overall labour utilization and thereby get a considerable savings on monthly labour cost. There might be some constraints over projecting the suggested orientation directly on the shopfloor as our analysis has been based on some preliminary assumptions (Details Appendix 6). Once it is implemented on the shopfloor, the analysis can be improved further based on the limitations faced. Moreover, the excel template prepared for the analysis can be used for other product categories and other production lines with minor changes as applicable. | URI: | https://repository.iimb.ac.in/handle/2074/21876 |
Appears in Collections: | 2022 |
Files in This Item:
File | Size | Format | |
---|---|---|---|
PGP_CCS_P22_020.pdf | 1.54 MB | Adobe PDF | View/Open Request a copy |
Google ScholarTM
Check
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.